Wagoneer Custom Home: Concrete Fireplace Installation

The forms are finally removed. We are in process of sealing the concrete, but we have successfully achieved the wood form look with strong horizontal lines.  Excited to see the upcoming walnut features.

The final pour and vibration of concrete.

View from the balcony. The process is slow.  To help alleviate cracking, we poured the facade to incorporate cold joints every 24-30 inches.  

planforwardComment