Baseview Custom Home: Start of Framing

Steel Pipe columns ready for install!

The first floor joist system being installed. Todd and crew are working on the stairway opening to the crawl space.

Detail of wall squash blocking at foundation wall.

The floor is decked and the wall layout is starting.

The first wall is up!  We are using 2x6 exterior walls due to the 10' ceilings.  

View from the dining room into the kitchen....a nice wide open space!